{"id":173,"date":"2020-02-20T21:16:10","date_gmt":"2020-02-20T21:16:10","guid":{"rendered":"http:\/\/awssection.allcovered.io\/holstonvalley\/?p=173"},"modified":"2020-02-20T21:19:24","modified_gmt":"2020-02-20T21:19:24","slug":"plant-tour-utility-trailer-recap","status":"publish","type":"post","link":"https:\/\/sections.aws.org\/holstonvalley\/2020\/02\/20\/plant-tour-utility-trailer-recap\/","title":{"rendered":"Plant Tour-Utility Trailer Recap"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t
\"\"<\/a><\/figure>

Plant Tour-Utility Trailer Recap<\/a><\/h3>

Our section meeting attendees were given a detailed tour of the manufacturing facility that included parts processing, sub-assembly manufacture, final assembly, and testing of their dry box trailers. The facility has over 5 acres under roof and the tour was split up into two groups. Over 100 welders are employed at the facility. The welding processes utilized included GMAW, GMAW-P, FCAW-G and FCAW-S. An AWS CWI oversees many of the quality control aspects related to welding performed. This was a great turnout for our meeting and it was great to network with other welding professionals in the Southwest Virginia region of our section.<\/p><\/div><\/div>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"

Plant Tour-Utility Trailer Recap Our section meeting attendees were given a detailed tour of the manufacturing facility that included parts processing, sub-assembly manufacture, final assembly, and testing of their dry box trailers. The facility has over 5 acres under roof and the tour was split up into two groups. Over 100 welders are employed at…<\/p>\n

Read More<\/span>+<\/i><\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[7],"tags":[],"rttpg_featured_image_url":null,"rttpg_author":{"display_name":"","author_link":"https:\/\/sections.aws.org\/holstonvalley\/author\/"},"rttpg_comment":0,"rttpg_category":"Announcement<\/a>","rttpg_excerpt":"Plant Tour-Utility Trailer Recap Our section meeting attendees were given a detailed tour of the manufacturing facility that included parts processing, sub-assembly manufacture, final assembly, and testing of their dry box trailers. The facility has over 5 acres under roof and the tour was split up into two groups. Over 100 welders are employed at…Read…","_links":{"self":[{"href":"https:\/\/sections.aws.org\/holstonvalley\/wp-json\/wp\/v2\/posts\/173"}],"collection":[{"href":"https:\/\/sections.aws.org\/holstonvalley\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sections.aws.org\/holstonvalley\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sections.aws.org\/holstonvalley\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/sections.aws.org\/holstonvalley\/wp-json\/wp\/v2\/comments?post=173"}],"version-history":[{"count":4,"href":"https:\/\/sections.aws.org\/holstonvalley\/wp-json\/wp\/v2\/posts\/173\/revisions"}],"predecessor-version":[{"id":179,"href":"https:\/\/sections.aws.org\/holstonvalley\/wp-json\/wp\/v2\/posts\/173\/revisions\/179"}],"wp:attachment":[{"href":"https:\/\/sections.aws.org\/holstonvalley\/wp-json\/wp\/v2\/media?parent=173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sections.aws.org\/holstonvalley\/wp-json\/wp\/v2\/categories?post=173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sections.aws.org\/holstonvalley\/wp-json\/wp\/v2\/tags?post=173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}